Annual Paving Program

Asphalt paving will take place during 2026 at the following locations:

  • Brennan Park – Turf Field parking lot.

2026

Brennan Park Turf Field Parking Lot and Trail

Work began April 20, 2026.

Scope: Paving of the existing parking area at Turf Field to enhance comfort and accessibility for all users of the Brennan Park facilities. The work will include line painting and the installation of speed bumps on the access road.

For safety reasons, access to the parking lot and access road will be closed during the paving work.

2025

2025 Paving Work

Scope: Milling and repaving of Cleveland Avenue between Pemberton Avenue and Buckley Avenue including new line painting.

Scope: Milling and repaving of Westway Avenue between Birch Drive and Plateau Drive. The work involved repaving multiple extensive sections as needed to address the most deteriorated areas.

The gravel area in the north east corner of the main parking lot was paved before the installation of EV chargers.

Scope: Milling, base preparation, and paving was carried out at two separate locations within the landfill to improve comfort and facilitate easier maintenance. Two speed bumps were installed to enhance safety within the landfill area.